新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 1 ヶ月)下限(%)上限(%)Kr(%)
10,0004.554.555.164.08
15,0004.384.384.963.88
20,0004.264.264.833.75
25,0004.174.174.733.66
30,0004.14.14.653.58
35,0004.044.044.583.51
40,0003.993.994.523.46
45,0003.943.944.473.41
50,0003.913.914.433.37
55,0003.873.874.393.33
60,0003.843.844.353.3
65,0003.813.814.323.26
70,0003.783.784.293.24
75,0003.763.764.263.21
80,0003.733.734.233.18
85,0003.713.714.213.16
90,0003.693.694.193.14
95,0003.673.674.163.12
100,0003.663.664.143.1
100,0003.663.664.143.1
150,0003.523.523.992.96
200,0003.423.423.882.86
250,0003.353.353.82.78
300,0003.293.293.732.72
350,0003.253.253.682.67
400,0003.23.23.632.63
450,0003.173.173.592.59
500,0003.143.143.562.56
550,0003.113.113.522.53
600,0003.083.083.492.51
650,0003.063.063.472.48
700,0003.043.043.442.46
750,0003.023.023.422.44
800,000333.42.42
850,0002.982.983.382.41
900,0002.972.973.362.39
950,0002.952.953.342.37
1,000,0002.942.943.332.36
1,000,0002.942.943.332.36
1,500,0002.832.833.22.25
2,000,0002.752.753.122.17
2,500,0002.692.693.052.12
3,000,0002.642.6432.07
3,500,0002.612.612.952.03
4,000,0002.572.572.922
4,500,0002.542.542.881.97
5,000,0002.522.522.861.95
5,500,0002.52.52.831.93
6,000,0002.482.482.811.91
6,500,0002.462.462.791.89
7,000,0002.442.442.771.87
7,500,0002.422.422.751.86
8,000,0002.412.412.731.84
8,500,0002.42.42.711.83
9,000,0002.382.382.71.82
9,500,0002.372.372.691.81
10,000,0002.362.362.671.8

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 2 ヶ月)下限(%)上限(%)Kr(%)
10,0004.554.555.164.33
15,0004.384.384.964.13
20,0004.264.264.833.99
25,0004.174.174.733.89
30,0004.14.14.653.8
35,0004.044.044.583.73
40,0003.993.994.523.68
45,0003.943.944.473.62
50,0003.913.914.433.58
55,0003.873.874.393.54
60,0003.843.844.353.5
65,0003.813.814.323.47
70,0003.783.784.293.44
75,0003.763.764.263.41
80,0003.733.734.233.39
85,0003.713.714.213.36
90,0003.693.694.193.34
95,0003.673.674.163.32
100,0003.663.664.143.3
100,0003.663.664.143.3
150,0003.523.523.993.14
200,0003.423.423.883.04
250,0003.353.353.82.96
300,0003.293.293.732.89
350,0003.253.253.682.84
400,0003.23.23.632.8
450,0003.173.173.592.76
500,0003.143.143.562.72
550,0003.113.113.522.69
600,0003.083.083.492.67
650,0003.063.063.472.64
700,0003.043.043.442.62
750,0003.023.023.422.6
800,000333.42.58
850,0002.982.983.382.56
900,0002.972.973.362.54
950,0002.952.953.342.52
1,000,0002.942.943.332.51
1,000,0002.942.943.332.51
1,500,0002.832.833.22.39
2,000,0002.752.753.122.31
2,500,0002.692.693.052.25
3,000,0002.642.6432.2
3,500,0002.612.612.952.16
4,000,0002.572.572.922.13
4,500,0002.542.542.882.1
5,000,0002.522.522.862.07
5,500,0002.52.52.832.05
6,000,0002.482.482.812.03
6,500,0002.462.462.792.01
7,000,0002.442.442.771.99
7,500,0002.422.422.751.98
8,000,0002.412.412.731.96
8,500,0002.42.42.711.95
9,000,0002.382.382.71.93
9,500,0002.372.372.691.92
10,000,0002.362.362.671.91

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 3 ヶ月)下限(%)上限(%)Kr(%)
10,0004.554.555.164.49
15,0004.384.384.964.28
20,0004.264.264.834.14
25,0004.174.174.734.03
30,0004.14.14.653.94
35,0004.044.044.583.87
40,0003.993.994.523.81
45,0003.943.944.473.76
50,0003.913.914.433.71
55,0003.873.874.393.67
60,0003.843.844.353.63
65,0003.813.814.323.6
70,0003.783.784.293.56
75,0003.763.764.263.54
80,0003.733.734.233.51
85,0003.713.714.213.48
90,0003.693.694.193.46
95,0003.673.674.163.44
100,0003.663.664.143.42
100,0003.663.664.143.42
150,0003.523.523.993.26
200,0003.423.423.883.15
250,0003.353.353.83.07
300,0003.293.293.733
350,0003.253.253.682.95
400,0003.23.23.632.9
450,0003.173.173.592.86
500,0003.143.143.562.82
550,0003.113.113.522.79
600,0003.083.083.492.76
650,0003.063.063.472.74
700,0003.043.043.442.71
750,0003.023.023.422.69
800,000333.42.67
850,0002.982.983.382.65
900,0002.972.973.362.63
950,0002.952.953.342.62
1,000,0002.942.943.332.6
1,000,0002.942.943.332.6
1,500,0002.832.833.22.48
2,000,0002.752.753.122.4
2,500,0002.692.693.052.33
3,000,0002.642.6432.28
3,500,0002.612.612.952.24
4,000,0002.572.572.922.21
4,500,0002.542.542.882.18
5,000,0002.522.522.862.15
5,500,0002.52.52.832.12
6,000,0002.482.482.812.1
6,500,0002.462.462.792.08
7,000,0002.442.442.772.06
7,500,0002.422.422.752.05
8,000,0002.412.412.732.03
8,500,0002.42.42.712.02
9,000,0002.382.382.72
9,500,0002.372.372.691.99
10,000,0002.362.362.671.98

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 4 ヶ月)下限(%)上限(%)Kr(%)
10,0004.614.555.164.61
15,0004.394.384.964.39
20,0004.264.264.834.24
25,0004.174.174.734.13
30,0004.14.14.654.04
35,0004.044.044.583.97
40,0003.993.994.523.91
45,0003.943.944.473.85
50,0003.913.914.433.81
55,0003.873.874.393.76
60,0003.843.844.353.72
65,0003.813.814.323.69
70,0003.783.784.293.66
75,0003.763.764.263.63
80,0003.733.734.233.6
85,0003.713.714.213.57
90,0003.693.694.193.55
95,0003.673.674.163.53
100,0003.663.664.143.5
100,0003.663.664.143.5
150,0003.523.523.993.34
200,0003.423.423.883.23
250,0003.353.353.83.14
300,0003.293.293.733.08
350,0003.253.253.683.02
400,0003.23.23.632.97
450,0003.173.173.592.93
500,0003.143.143.562.9
550,0003.113.113.522.86
600,0003.083.083.492.83
650,0003.063.063.472.81
700,0003.043.043.442.78
750,0003.023.023.422.76
800,000333.42.74
850,0002.982.983.382.72
900,0002.972.973.362.7
950,0002.952.953.342.68
1,000,0002.942.943.332.67
1,000,0002.942.943.332.67
1,500,0002.832.833.22.54
2,000,0002.752.753.122.46
2,500,0002.692.693.052.39
3,000,0002.642.6432.34
3,500,0002.612.612.952.3
4,000,0002.572.572.922.26
4,500,0002.542.542.882.23
5,000,0002.522.522.862.2
5,500,0002.52.52.832.18
6,000,0002.482.482.812.16
6,500,0002.462.462.792.14
7,000,0002.442.442.772.12
7,500,0002.422.422.752.1
8,000,0002.412.412.732.08
8,500,0002.42.42.712.07
9,000,0002.382.382.72.06
9,500,0002.372.372.692.04
10,000,0002.362.362.672.03

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 5 ヶ月)下限(%)上限(%)Kr(%)
10,0004.74.555.164.7
15,0004.484.384.964.48
20,0004.334.264.834.33
25,0004.214.174.734.21
30,0004.124.14.654.12
35,0004.054.044.584.05
40,0003.993.994.523.98
45,0003.943.944.473.93
50,0003.913.914.433.88
55,0003.873.874.393.84
60,0003.843.844.353.8
65,0003.813.814.323.76
70,0003.783.784.293.73
75,0003.763.764.263.7
80,0003.733.734.233.67
85,0003.713.714.213.64
90,0003.693.694.193.62
95,0003.673.674.163.6
100,0003.663.664.143.57
100,0003.663.664.143.57
150,0003.523.523.993.41
200,0003.423.423.883.29
250,0003.353.353.83.21
300,0003.293.293.733.14
350,0003.253.253.683.08
400,0003.23.23.633.03
450,0003.173.173.592.99
500,0003.143.143.562.95
550,0003.113.113.522.92
600,0003.083.083.492.89
650,0003.063.063.472.86
700,0003.043.043.442.84
750,0003.023.023.422.81
800,000333.42.79
850,0002.982.983.382.77
900,0002.972.973.362.75
950,0002.952.953.342.74
1,000,0002.942.943.332.72
1,000,0002.942.943.332.72
1,500,0002.832.833.22.59
2,000,0002.752.753.122.51
2,500,0002.692.693.052.44
3,000,0002.642.6432.39
3,500,0002.612.612.952.34
4,000,0002.572.572.922.31
4,500,0002.542.542.882.28
5,000,0002.522.522.862.25
5,500,0002.52.52.832.22
6,000,0002.482.482.812.2
6,500,0002.462.462.792.18
7,000,0002.442.442.772.16
7,500,0002.422.422.752.14
8,000,0002.412.412.732.13
8,500,0002.42.42.712.11
9,000,0002.382.382.72.1
9,500,0002.372.372.692.08
10,000,0002.362.362.672.07

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 6 ヶ月)下限(%)上限(%)Kr(%)
10,0004.774.555.164.77
15,0004.554.384.964.55
20,0004.44.264.834.4
25,0004.284.174.734.28
30,0004.194.14.654.19
35,0004.114.044.584.11
40,0004.053.994.524.05
45,0003.993.944.473.99
50,0003.943.914.433.94
55,0003.93.874.393.9
60,0003.863.844.353.86
65,0003.823.814.323.82
70,0003.793.784.293.79
75,0003.763.764.263.76
80,0003.733.734.233.73
85,0003.713.714.213.7
90,0003.693.694.193.68
95,0003.673.674.163.65
100,0003.663.664.143.63
100,0003.663.664.143.63
150,0003.523.523.993.46
200,0003.423.423.883.35
250,0003.353.353.83.26
300,0003.293.293.733.19
350,0003.253.253.683.13
400,0003.23.23.633.08
450,0003.173.173.593.04
500,0003.143.143.563
550,0003.113.113.522.97
600,0003.083.083.492.94
650,0003.063.063.472.91
700,0003.043.043.442.88
750,0003.023.023.422.86
800,000333.42.84
850,0002.982.983.382.82
900,0002.972.973.362.8
950,0002.952.953.342.78
1,000,0002.942.943.332.76
1,000,0002.942.943.332.76
1,500,0002.832.833.22.63
2,000,0002.752.753.122.55
2,500,0002.692.693.052.48
3,000,0002.642.6432.43
3,500,0002.612.612.952.38
4,000,0002.572.572.922.35
4,500,0002.542.542.882.31
5,000,0002.522.522.862.28
5,500,0002.52.52.832.26
6,000,0002.482.482.812.24
6,500,0002.462.462.792.21
7,000,0002.442.442.772.19
7,500,0002.422.422.752.18
8,000,0002.412.412.732.16
8,500,0002.42.42.712.14
9,000,0002.382.382.72.13
9,500,0002.372.372.692.12
10,000,0002.362.362.672.1

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 7 ヶ月)下限(%)上限(%)Kr(%)
10,0004.844.555.164.84
15,0004.614.384.964.61
20,0004.464.264.834.46
25,0004.344.174.734.34
30,0004.254.14.654.25
35,0004.174.044.584.17
40,0004.13.994.524.1
45,0004.053.944.474.05
50,00043.914.434
55,0003.953.874.393.95
60,0003.913.844.353.91
65,0003.883.814.323.88
70,0003.843.784.293.84
75,0003.813.764.263.81
80,0003.783.734.233.78
85,0003.753.714.213.75
90,0003.733.694.193.73
95,0003.73.674.163.7
100,0003.683.664.143.68
100,0003.683.664.143.68
150,0003.523.523.993.51
200,0003.423.423.883.39
250,0003.353.353.83.3
300,0003.293.293.733.23
350,0003.253.253.683.17
400,0003.23.23.633.12
450,0003.173.173.593.08
500,0003.143.143.563.04
550,0003.113.113.523.01
600,0003.083.083.492.98
650,0003.063.063.472.95
700,0003.043.043.442.92
750,0003.023.023.422.9
800,000333.42.88
850,0002.982.983.382.86
900,0002.972.973.362.84
950,0002.952.953.342.82
1,000,0002.942.943.332.8
1,000,0002.942.943.332.8
1,500,0002.832.833.22.67
2,000,0002.752.753.122.58
2,500,0002.692.693.052.51
3,000,0002.642.6432.46
3,500,0002.612.612.952.42
4,000,0002.572.572.922.38
4,500,0002.542.542.882.34
5,000,0002.522.522.862.32
5,500,0002.52.52.832.29
6,000,0002.482.482.812.27
6,500,0002.462.462.792.24
7,000,0002.442.442.772.22
7,500,0002.422.422.752.21
8,000,0002.412.412.732.19
8,500,0002.42.42.712.17
9,000,0002.382.382.72.16
9,500,0002.372.372.692.15
10,000,0002.362.362.672.13

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 8 ヶ月)下限(%)上限(%)Kr(%)
10,0004.94.555.164.9
15,0004.674.384.964.67
20,0004.514.264.834.51
25,0004.394.174.734.39
30,0004.34.14.654.3
35,0004.224.044.584.22
40,0004.153.994.524.15
45,0004.13.944.474.1
50,0004.053.914.434.05
55,00043.874.394
60,0003.963.844.353.96
65,0003.923.814.323.92
70,0003.893.784.293.89
75,0003.863.764.263.86
80,0003.833.734.233.83
85,0003.83.714.213.8
90,0003.773.694.193.77
95,0003.753.674.163.75
100,0003.733.664.143.73
100,0003.733.664.143.73
150,0003.553.523.993.55
200,0003.433.423.883.43
250,0003.353.353.83.34
300,0003.293.293.733.27
350,0003.253.253.683.21
400,0003.23.23.633.16
450,0003.173.173.593.12
500,0003.143.143.563.08
550,0003.113.113.523.04
600,0003.083.083.493.01
650,0003.063.063.472.98
700,0003.043.043.442.96
750,0003.023.023.422.93
800,000333.42.91
850,0002.982.983.382.89
900,0002.972.973.362.87
950,0002.952.953.342.85
1,000,0002.942.943.332.84
1,000,0002.942.943.332.84
1,500,0002.832.833.22.7
2,000,0002.752.753.122.61
2,500,0002.692.693.052.54
3,000,0002.642.6432.49
3,500,0002.612.612.952.44
4,000,0002.572.572.922.41
4,500,0002.542.542.882.37
5,000,0002.522.522.862.34
5,500,0002.52.52.832.32
6,000,0002.482.482.812.29
6,500,0002.462.462.792.27
7,000,0002.442.442.772.25
7,500,0002.422.422.752.23
8,000,0002.412.412.732.22
8,500,0002.42.42.712.2
9,000,0002.382.382.72.19
9,500,0002.372.372.692.17
10,000,0002.362.362.672.16

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 9 ヶ月)下限(%)上限(%)Kr(%)
10,0004.954.555.164.95
15,0004.714.384.964.71
20,0004.564.264.834.56
25,0004.444.174.734.44
30,0004.344.14.654.34
35,0004.264.044.584.26
40,0004.23.994.524.2
45,0004.143.944.474.14
50,0004.093.914.434.09
55,0004.043.874.394.04
60,00043.844.354
65,0003.963.814.323.96
70,0003.933.784.293.93
75,0003.93.764.263.9
80,0003.873.734.233.87
85,0003.843.714.213.84
90,0003.813.694.193.81
95,0003.793.674.163.79
100,0003.763.664.143.76
100,0003.763.664.143.76
150,0003.593.523.993.59
200,0003.473.423.883.47
250,0003.383.353.83.38
300,0003.33.293.733.3
350,0003.253.253.683.24
400,0003.23.23.633.19
450,0003.173.173.593.15
500,0003.143.143.563.11
550,0003.113.113.523.08
600,0003.083.083.493.04
650,0003.063.063.473.02
700,0003.043.043.442.99
750,0003.023.023.422.96
800,000333.42.94
850,0002.982.983.382.92
900,0002.972.973.362.9
950,0002.952.953.342.88
1,000,0002.942.943.332.87
1,000,0002.942.943.332.87
1,500,0002.832.833.22.73
2,000,0002.752.753.122.64
2,500,0002.692.693.052.57
3,000,0002.642.6432.52
3,500,0002.612.612.952.47
4,000,0002.572.572.922.43
4,500,0002.542.542.882.4
5,000,0002.522.522.862.37
5,500,0002.52.52.832.34
6,000,0002.482.482.812.32
6,500,0002.462.462.792.29
7,000,0002.442.442.772.27
7,500,0002.422.422.752.26
8,000,0002.412.412.732.24
8,500,0002.42.42.712.22
9,000,0002.382.382.72.21
9,500,0002.372.372.692.19
10,000,0002.362.362.672.18

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 10 ヶ月)下限(%)上限(%)Kr(%)
10,0004.994.555.164.99
15,0004.764.384.964.76
20,0004.64.264.834.6
25,0004.484.174.734.48
30,0004.384.14.654.38
35,0004.34.044.584.3
40,0004.243.994.524.24
45,0004.183.944.474.18
50,0004.133.914.434.13
55,0004.083.874.394.08
60,0004.043.844.354.04
65,00043.814.324
70,0003.963.784.293.96
75,0003.933.764.263.93
80,0003.93.734.233.9
85,0003.873.714.213.87
90,0003.853.694.193.85
95,0003.823.674.163.82
100,0003.83.664.143.8
100,0003.83.664.143.8
150,0003.623.523.993.62
200,0003.53.423.883.5
250,0003.413.353.83.41
300,0003.343.293.733.34
350,0003.283.253.683.28
400,0003.223.23.633.22
450,0003.183.173.593.18
500,0003.143.143.563.14
550,0003.113.113.523.1
600,0003.083.083.493.07
650,0003.063.063.473.04
700,0003.043.043.443.02
750,0003.023.023.422.99
800,000333.42.97
850,0002.982.983.382.95
900,0002.972.973.362.93
950,0002.952.953.342.91
1,000,0002.942.943.332.89
1,000,0002.942.943.332.89
1,500,0002.832.833.22.76
2,000,0002.752.753.122.66
2,500,0002.692.693.052.59
3,000,0002.642.6432.54
3,500,0002.612.612.952.49
4,000,0002.572.572.922.45
4,500,0002.542.542.882.42
5,000,0002.522.522.862.39
5,500,0002.52.52.832.36
6,000,0002.482.482.812.34
6,500,0002.462.462.792.32
7,000,0002.442.442.772.3
7,500,0002.422.422.752.28
8,000,0002.412.412.732.26
8,500,0002.42.42.712.24
9,000,0002.382.382.72.23
9,500,0002.372.372.692.21
10,000,0002.362.362.672.2

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 11 ヶ月)下限(%)上限(%)Kr(%)
10,0005.044.555.165.04
15,0004.84.384.964.8
20,0004.644.264.834.64
25,0004.524.174.734.52
30,0004.424.14.654.42
35,0004.344.044.584.34
40,0004.273.994.524.27
45,0004.213.944.474.21
50,0004.163.914.434.16
55,0004.113.874.394.11
60,0004.073.844.354.07
65,0004.033.814.324.03
70,00043.784.294
75,0003.973.764.263.97
80,0003.933.734.233.93
85,0003.913.714.213.91
90,0003.883.694.193.88
95,0003.863.674.163.86
100,0003.833.664.143.83
100,0003.833.664.143.83
150,0003.653.523.993.65
200,0003.533.423.883.53
250,0003.443.353.83.44
300,0003.363.293.733.36
350,0003.33.253.683.3
400,0003.253.23.633.25
450,0003.213.173.593.21
500,0003.173.143.563.17
550,0003.133.113.523.13
600,0003.13.083.493.1
650,0003.073.063.473.07
700,0003.043.043.443.04
750,0003.023.023.423.02
800,000333.42.99
850,0002.982.983.382.97
900,0002.972.973.362.95
950,0002.952.953.342.93
1,000,0002.942.943.332.92
1,000,0002.942.943.332.92
1,500,0002.832.833.22.78
2,000,0002.752.753.122.69
2,500,0002.692.693.052.62
3,000,0002.642.6432.56
3,500,0002.612.612.952.51
4,000,0002.572.572.922.47
4,500,0002.542.542.882.44
5,000,0002.522.522.862.41
5,500,0002.52.52.832.38
6,000,0002.482.482.812.36
6,500,0002.462.462.792.34
7,000,0002.442.442.772.32
7,500,0002.422.422.752.3
8,000,0002.412.412.732.28
8,500,0002.42.42.712.26
9,000,0002.382.382.72.25
9,500,0002.372.372.692.23
10,000,0002.362.362.672.22

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 12 ヶ月)下限(%)上限(%)Kr(%)
10,0005.074.555.165.07
15,0004.844.384.964.84
20,0004.674.264.834.67
25,0004.554.174.734.55
30,0004.454.14.654.45
35,0004.374.044.584.37
40,0004.33.994.524.3
45,0004.253.944.474.25
50,0004.193.914.434.19
55,0004.153.874.394.15
60,0004.13.844.354.1
65,0004.063.814.324.06
70,0004.033.784.294.03
75,00043.764.264
80,0003.973.734.233.97
85,0003.943.714.213.94
90,0003.913.694.193.91
95,0003.893.674.163.89
100,0003.863.664.143.86
100,0003.863.664.143.86
150,0003.683.523.993.68
200,0003.563.423.883.56
250,0003.463.353.83.46
300,0003.393.293.733.39
350,0003.333.253.683.33
400,0003.283.23.633.28
450,0003.233.173.593.23
500,0003.193.143.563.19
550,0003.153.113.523.15
600,0003.123.083.493.12
650,0003.093.063.473.09
700,0003.073.043.443.07
750,0003.043.023.423.04
800,0003.0233.43.02
850,00032.983.383
900,0002.982.973.362.98
950,0002.962.953.342.96
1,000,0002.942.943.332.94
1,000,0002.942.943.332.94
1,500,0002.832.833.22.8
2,000,0002.752.753.122.71
2,500,0002.692.693.052.64
3,000,0002.642.6432.58
3,500,0002.612.612.952.53
4,000,0002.572.572.922.49
4,500,0002.542.542.882.46
5,000,0002.522.522.862.43
5,500,0002.52.52.832.4
6,000,0002.482.482.812.38
6,500,0002.462.462.792.35
7,000,0002.442.442.772.33
7,500,0002.422.422.752.31
8,000,0002.412.412.732.3
8,500,0002.42.42.712.28
9,000,0002.382.382.72.26
9,500,0002.372.372.692.25
10,000,0002.362.362.672.24

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 13 ヶ月)下限(%)上限(%)Kr(%)
10,0005.114.555.165.11
15,0004.874.384.964.87
20,0004.714.264.834.71
25,0004.584.174.734.58
30,0004.494.14.654.49
35,0004.44.044.584.4
40,0004.343.994.524.34
45,0004.283.944.474.28
50,0004.223.914.434.22
55,0004.173.874.394.17
60,0004.133.844.354.13
65,0004.093.814.324.09
70,0004.063.784.294.06
75,0004.023.764.264.02
80,0003.993.734.233.99
85,0003.963.714.213.96
90,0003.943.694.193.94
95,0003.913.674.163.91
100,0003.893.664.143.89
100,0003.893.664.143.89
150,0003.713.523.993.71
200,0003.583.423.883.58
250,0003.493.353.83.49
300,0003.413.293.733.41
350,0003.353.253.683.35
400,0003.33.23.633.3
450,0003.253.173.593.25
500,0003.213.143.563.21
550,0003.183.113.523.18
600,0003.143.083.493.14
650,0003.113.063.473.11
700,0003.093.043.443.09
750,0003.063.023.423.06
800,0003.0433.43.04
850,0003.022.983.383.02
900,00032.973.363
950,0002.982.953.342.98
1,000,0002.962.943.332.96
1,000,0002.962.943.332.96
1,500,0002.832.833.22.82
2,000,0002.752.753.122.73
2,500,0002.692.693.052.65
3,000,0002.642.6432.6
3,500,0002.612.612.952.55
4,000,0002.572.572.922.51
4,500,0002.542.542.882.48
5,000,0002.522.522.862.45
5,500,0002.52.52.832.42
6,000,0002.482.482.812.39
6,500,0002.462.462.792.37
7,000,0002.442.442.772.35
7,500,0002.422.422.752.33
8,000,0002.412.412.732.31
8,500,0002.42.42.712.3
9,000,0002.382.382.72.28
9,500,0002.372.372.692.27
10,000,0002.362.362.672.25

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 14 ヶ月)下限(%)上限(%)Kr(%)
10,0005.144.555.165.14
15,0004.94.384.964.9
20,0004.744.264.834.74
25,0004.614.174.734.61
30,0004.524.14.654.52
35,0004.434.044.584.43
40,0004.363.994.524.36
45,0004.33.944.474.3
50,0004.253.914.434.25
55,0004.23.874.394.2
60,0004.163.844.354.16
65,0004.123.814.324.12
70,0004.083.784.294.08
75,0004.053.764.264.05
80,0004.023.734.234.02
85,0003.993.714.213.99
90,0003.963.694.193.96
95,0003.943.674.163.94
100,0003.913.664.143.91
100,0003.913.664.143.91
150,0003.733.523.993.73
200,0003.613.423.883.61
250,0003.513.353.83.51
300,0003.443.293.733.44
350,0003.373.253.683.37
400,0003.323.23.633.32
450,0003.273.173.593.27
500,0003.233.143.563.23
550,0003.23.113.523.2
600,0003.173.083.493.17
650,0003.143.063.473.14
700,0003.113.043.443.11
750,0003.083.023.423.08
800,0003.0633.43.06
850,0003.042.983.383.04
900,0003.022.973.363.02
950,00032.953.343
1,000,0002.982.943.332.98
1,000,0002.982.943.332.98
1,500,0002.842.833.22.84
2,000,0002.752.753.122.74
2,500,0002.692.693.052.67
3,000,0002.642.6432.62
3,500,0002.612.612.952.57
4,000,0002.572.572.922.53
4,500,0002.542.542.882.49
5,000,0002.522.522.862.46
5,500,0002.52.52.832.43
6,000,0002.482.482.812.41
6,500,0002.462.462.792.39
7,000,0002.442.442.772.37
7,500,0002.422.422.752.35
8,000,0002.412.412.732.33
8,500,0002.42.42.712.31
9,000,0002.382.382.72.3
9,500,0002.372.372.692.28
10,000,0002.362.362.672.27

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 15 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.17
15,0004.934.384.964.93
20,0004.774.264.834.77
25,0004.644.174.734.64
30,0004.544.14.654.54
35,0004.464.044.584.46
40,0004.393.994.524.39
45,0004.333.944.474.33
50,0004.283.914.434.28
55,0004.233.874.394.23
60,0004.183.844.354.18
65,0004.143.814.324.14
70,0004.113.784.294.11
75,0004.073.764.264.07
80,0004.043.734.234.04
85,0004.013.714.214.01
90,0003.993.694.193.99
95,0003.963.674.163.96
100,0003.943.664.143.94
100,0003.943.664.143.94
150,0003.753.523.993.75
200,0003.633.423.883.63
250,0003.533.353.83.53
300,0003.463.293.733.46
350,0003.393.253.683.39
400,0003.343.23.633.34
450,0003.293.173.593.29
500,0003.253.143.563.25
550,0003.223.113.523.22
600,0003.183.083.493.18
650,0003.153.063.473.15
700,0003.133.043.443.13
750,0003.13.023.423.1
800,0003.0833.43.08
850,0003.062.983.383.06
900,0003.032.973.363.03
950,0003.022.953.343.02
1,000,00032.943.333
1,000,00032.943.333
1,500,0002.862.833.22.86
2,000,0002.762.753.122.76
2,500,0002.692.693.052.69
3,000,0002.642.6432.63
3,500,0002.612.612.952.58
4,000,0002.572.572.922.54
4,500,0002.542.542.882.51
5,000,0002.522.522.862.48
5,500,0002.52.52.832.45
6,000,0002.482.482.812.42
6,500,0002.462.462.792.4
7,000,0002.442.442.772.38
7,500,0002.422.422.752.36
8,000,0002.412.412.732.34
8,500,0002.42.42.712.33
9,000,0002.382.382.72.31
9,500,0002.372.372.692.29
10,000,0002.362.362.672.28

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 16 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.2
15,0004.964.384.964.96
20,0004.794.264.834.79
25,0004.674.174.734.67
30,0004.574.14.654.57
35,0004.494.044.584.49
40,0004.423.994.524.42
45,0004.353.944.474.35
50,0004.33.914.434.3
55,0004.253.874.394.25
60,0004.213.844.354.21
65,0004.173.814.324.17
70,0004.133.784.294.13
75,0004.13.764.264.1
80,0004.073.734.234.07
85,0004.043.714.214.04
90,0004.013.694.194.01
95,0003.983.674.163.98
100,0003.963.664.143.96
100,0003.963.664.143.96
150,0003.773.523.993.77
200,0003.653.423.883.65
250,0003.553.353.83.55
300,0003.483.293.733.48
350,0003.413.253.683.41
400,0003.363.23.633.36
450,0003.313.173.593.31
500,0003.273.143.563.27
550,0003.243.113.523.24
600,0003.23.083.493.2
650,0003.173.063.473.17
700,0003.143.043.443.14
750,0003.123.023.423.12
800,0003.133.43.1
850,0003.072.983.383.07
900,0003.052.973.363.05
950,0003.032.953.343.03
1,000,0003.012.943.333.01
1,000,0003.012.943.333.01
1,500,0002.872.833.22.87
2,000,0002.782.753.122.78
2,500,0002.72.693.052.7
3,000,0002.652.6432.65
3,500,0002.612.612.952.6
4,000,0002.572.572.922.56
4,500,0002.542.542.882.52
5,000,0002.522.522.862.49
5,500,0002.52.52.832.46
6,000,0002.482.482.812.44
6,500,0002.462.462.792.41
7,000,0002.442.442.772.39
7,500,0002.422.422.752.37
8,000,0002.412.412.732.36
8,500,0002.42.42.712.34
9,000,0002.382.382.72.32
9,500,0002.372.372.692.31
10,000,0002.362.362.672.29

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 17 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.23
15,0004.964.384.964.99
20,0004.824.264.834.82
25,0004.694.174.734.69
30,0004.594.14.654.59
35,0004.514.044.584.51
40,0004.443.994.524.44
45,0004.383.944.474.38
50,0004.323.914.434.32
55,0004.273.874.394.27
60,0004.233.844.354.23
65,0004.193.814.324.19
70,0004.153.784.294.15
75,0004.123.764.264.12
80,0004.093.734.234.09
85,0004.063.714.214.06
90,0004.033.694.194.03
95,0004.013.674.164.01
100,0003.983.664.143.98
100,0003.983.664.143.98
150,0003.83.523.993.8
200,0003.673.423.883.67
250,0003.573.353.83.57
300,0003.53.293.733.5
350,0003.433.253.683.43
400,0003.383.23.633.38
450,0003.333.173.593.33
500,0003.293.143.563.29
550,0003.253.113.523.25
600,0003.223.083.493.22
650,0003.193.063.473.19
700,0003.163.043.443.16
750,0003.143.023.423.14
800,0003.1133.43.11
850,0003.092.983.383.09
900,0003.072.973.363.07
950,0003.052.953.343.05
1,000,0003.032.943.333.03
1,000,0003.032.943.333.03
1,500,0002.892.833.22.89
2,000,0002.792.753.122.79
2,500,0002.722.693.052.72
3,000,0002.662.6432.66
3,500,0002.612.612.952.61
4,000,0002.572.572.922.57
4,500,0002.542.542.882.54
5,000,0002.522.522.862.5
5,500,0002.52.52.832.48
6,000,0002.482.482.812.45
6,500,0002.462.462.792.43
7,000,0002.442.442.772.41
7,500,0002.422.422.752.39
8,000,0002.412.412.732.37
8,500,0002.42.42.712.35
9,000,0002.382.382.72.34
9,500,0002.372.372.692.32
10,000,0002.362.362.672.31

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 18 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.26
15,0004.964.384.965.01
20,0004.834.264.834.84
25,0004.724.174.734.72
30,0004.624.14.654.62
35,0004.534.044.584.53
40,0004.463.994.524.46
45,0004.43.944.474.4
50,0004.353.914.434.35
55,0004.33.874.394.3
60,0004.253.844.354.25
65,0004.213.814.324.21
70,0004.183.784.294.18
75,0004.143.764.264.14
80,0004.113.734.234.11
85,0004.083.714.214.08
90,0004.053.694.194.05
95,0004.033.674.164.03
100,00043.664.144
100,00043.664.144
150,0003.813.523.993.81
200,0003.693.423.883.69
250,0003.593.353.83.59
300,0003.513.293.733.51
350,0003.453.253.683.45
400,0003.43.23.633.4
450,0003.353.173.593.35
500,0003.313.143.563.31
550,0003.273.113.523.27
600,0003.243.083.493.24
650,0003.213.063.473.21
700,0003.183.043.443.18
750,0003.153.023.423.15
800,0003.1333.43.13
850,0003.112.983.383.11
900,0003.082.973.363.08
950,0003.062.953.343.06
1,000,0003.052.943.333.05
1,000,0003.052.943.333.05
1,500,0002.92.833.22.9
2,000,0002.812.753.122.81
2,500,0002.732.693.052.73
3,000,0002.672.6432.67
3,500,0002.632.612.952.63
4,000,0002.582.572.922.58
4,500,0002.552.542.882.55
5,000,0002.522.522.862.52
5,500,0002.52.52.832.49
6,000,0002.482.482.812.46
6,500,0002.462.462.792.44
7,000,0002.442.442.772.42
7,500,0002.422.422.752.4
8,000,0002.412.412.732.38
8,500,0002.42.42.712.36
9,000,0002.382.382.72.35
9,500,0002.372.372.692.33
10,000,0002.362.362.672.32

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 19 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.28
15,0004.964.384.965.04
20,0004.834.264.834.87
25,0004.734.174.734.74
30,0004.644.14.654.64
35,0004.554.044.584.55
40,0004.483.994.524.48
45,0004.423.944.474.42
50,0004.373.914.434.37
55,0004.323.874.394.32
60,0004.273.844.354.27
65,0004.233.814.324.23
70,0004.23.784.294.2
75,0004.163.764.264.16
80,0004.133.734.234.13
85,0004.13.714.214.1
90,0004.073.694.194.07
95,0004.053.674.164.05
100,0004.023.664.144.02
100,0004.023.664.144.02
150,0003.833.523.993.83
200,0003.73.423.883.7
250,0003.613.353.83.61
300,0003.533.293.733.53
350,0003.473.253.683.47
400,0003.413.23.633.41
450,0003.363.173.593.36
500,0003.323.143.563.32
550,0003.293.113.523.29
600,0003.253.083.493.25
650,0003.223.063.473.22
700,0003.193.043.443.19
750,0003.173.023.423.17
800,0003.1433.43.14
850,0003.122.983.383.12
900,0003.12.973.363.1
950,0003.082.953.343.08
1,000,0003.062.943.333.06
1,000,0003.062.943.333.06
1,500,0002.922.833.22.92
2,000,0002.822.753.122.82
2,500,0002.752.693.052.75
3,000,0002.692.6432.69
3,500,0002.642.612.952.64
4,000,0002.62.572.922.6
4,500,0002.562.542.882.56
5,000,0002.532.522.862.53
5,500,0002.52.52.832.5
6,000,0002.482.482.812.47
6,500,0002.462.462.792.45
7,000,0002.442.442.772.43
7,500,0002.422.422.752.41
8,000,0002.412.412.732.39
8,500,0002.42.42.712.37
9,000,0002.382.382.72.36
9,500,0002.372.372.692.34
10,000,0002.362.362.672.33

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 20 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.31
15,0004.964.384.965.06
20,0004.834.264.834.89
25,0004.734.174.734.76
30,0004.654.14.654.66
35,0004.584.044.584.58
40,0004.53.994.524.5
45,0004.443.944.474.44
50,0004.393.914.434.39
55,0004.343.874.394.34
60,0004.293.844.354.29
65,0004.253.814.324.25
70,0004.213.784.294.21
75,0004.183.764.264.18
80,0004.153.734.234.15
85,0004.123.714.214.12
90,0004.093.694.194.09
95,0004.063.674.164.06
100,0004.043.664.144.04
100,0004.043.664.144.04
150,0003.853.523.993.85
200,0003.723.423.883.72
250,0003.623.353.83.62
300,0003.553.293.733.55
350,0003.483.253.683.48
400,0003.433.23.633.43
450,0003.383.173.593.38
500,0003.343.143.563.34
550,0003.33.113.523.3
600,0003.273.083.493.27
650,0003.243.063.473.24
700,0003.213.043.443.21
750,0003.183.023.423.18
800,0003.1633.43.16
850,0003.132.983.383.13
900,0003.112.973.363.11
950,0003.092.953.343.09
1,000,0003.072.943.333.07
1,000,0003.072.943.333.07
1,500,0002.932.833.22.93
2,000,0002.832.753.122.83
2,500,0002.762.693.052.76
3,000,0002.72.6432.7
3,500,0002.652.612.952.65
4,000,0002.612.572.922.61
4,500,0002.572.542.882.57
5,000,0002.542.522.862.54
5,500,0002.512.52.832.51
6,000,0002.492.482.812.49
6,500,0002.462.462.792.46
7,000,0002.442.442.772.44
7,500,0002.422.422.752.42
8,000,0002.412.412.732.4
8,500,0002.42.42.712.39
9,000,0002.382.382.72.37
9,500,0002.372.372.692.35
10,000,0002.362.362.672.34

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 21 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.33
15,0004.964.384.965.08
20,0004.834.264.834.91
25,0004.734.174.734.78
30,0004.654.14.654.68
35,0004.584.044.584.59
40,0004.523.994.524.52
45,0004.463.944.474.46
50,0004.43.914.434.4
55,0004.363.874.394.36
60,0004.313.844.354.31
65,0004.273.814.324.27
70,0004.233.784.294.23
75,0004.23.764.264.2
80,0004.173.734.234.17
85,0004.143.714.214.14
90,0004.113.694.194.11
95,0004.083.674.164.08
100,0004.063.664.144.06
100,0004.063.664.144.06
150,0003.873.523.993.87
200,0003.743.423.883.74
250,0003.643.353.83.64
300,0003.563.293.733.56
350,0003.53.253.683.5
400,0003.443.23.633.44
450,0003.393.173.593.39
500,0003.353.143.563.35
550,0003.313.113.523.31
600,0003.283.083.493.28
650,0003.253.063.473.25
700,0003.223.043.443.22
750,0003.193.023.423.19
800,0003.1733.43.17
850,0003.152.983.383.15
900,0003.132.973.363.13
950,0003.112.953.343.11
1,000,0003.092.943.333.09
1,000,0003.092.943.333.09
1,500,0002.942.833.22.94
2,000,0002.842.753.122.84
2,500,0002.772.693.052.77
3,000,0002.712.6432.71
3,500,0002.662.612.952.66
4,000,0002.622.572.922.62
4,500,0002.582.542.882.58
5,000,0002.552.522.862.55
5,500,0002.522.52.832.52
6,000,0002.52.482.812.5
6,500,0002.472.462.792.47
7,000,0002.452.442.772.45
7,500,0002.432.422.752.43
8,000,0002.412.412.732.41
8,500,0002.42.42.712.4
9,000,0002.382.382.72.38
9,500,0002.372.372.692.36
10,000,0002.362.362.672.35

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 22 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.35
15,0004.964.384.965.1
20,0004.834.264.834.93
25,0004.734.174.734.8
30,0004.654.14.654.7
35,0004.584.044.584.61
40,0004.523.994.524.54
45,0004.473.944.474.48
50,0004.423.914.434.42
55,0004.373.874.394.37
60,0004.333.844.354.33
65,0004.293.814.324.29
70,0004.253.784.294.25
75,0004.213.764.264.21
80,0004.183.734.234.18
85,0004.153.714.214.15
90,0004.123.694.194.12
95,0004.13.674.164.1
100,0004.073.664.144.07
100,0004.073.664.144.07
150,0003.883.523.993.88
200,0003.753.423.883.75
250,0003.653.353.83.65
300,0003.583.293.733.58
350,0003.513.253.683.51
400,0003.463.23.633.46
450,0003.413.173.593.41
500,0003.373.143.563.37
550,0003.333.113.523.33
600,0003.293.083.493.29
650,0003.263.063.473.26
700,0003.233.043.443.23
750,0003.213.023.423.21
800,0003.1833.43.18
850,0003.162.983.383.16
900,0003.142.973.363.14
950,0003.122.953.343.12
1,000,0003.12.943.333.1
1,000,0003.12.943.333.1
1,500,0002.952.833.22.95
2,000,0002.862.753.122.86
2,500,0002.782.693.052.78
3,000,0002.722.6432.72
3,500,0002.672.612.952.67
4,000,0002.632.572.922.63
4,500,0002.592.542.882.59
5,000,0002.562.522.862.56
5,500,0002.532.52.832.53
6,000,0002.512.482.812.51
6,500,0002.482.462.792.48
7,000,0002.462.442.772.46
7,500,0002.442.422.752.44
8,000,0002.422.412.732.42
8,500,0002.412.42.712.41
9,000,0002.392.382.72.39
9,500,0002.372.372.692.37
10,000,0002.362.362.672.36

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 23 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.37
15,0004.964.384.965.12
20,0004.834.264.834.95
25,0004.734.174.734.82
30,0004.654.14.654.72
35,0004.584.044.584.63
40,0004.523.994.524.56
45,0004.473.944.474.5
50,0004.433.914.434.44
55,0004.393.874.394.39
60,0004.353.844.354.35
65,0004.33.814.324.3
70,0004.273.784.294.27
75,0004.233.764.264.23
80,0004.23.734.234.2
85,0004.173.714.214.17
90,0004.143.694.194.14
95,0004.113.674.164.11
100,0004.093.664.144.09
100,0004.093.664.144.09
150,0003.93.523.993.9
200,0003.773.423.883.77
250,0003.673.353.83.67
300,0003.593.293.733.59
350,0003.523.253.683.52
400,0003.473.23.633.47
450,0003.423.173.593.42
500,0003.383.143.563.38
550,0003.343.113.523.34
600,0003.313.083.493.31
650,0003.283.063.473.28
700,0003.253.043.443.25
750,0003.223.023.423.22
800,0003.233.43.2
850,0003.172.983.383.17
900,0003.152.973.363.15
950,0003.132.953.343.13
1,000,0003.112.943.333.11
1,000,0003.112.943.333.11
1,500,0002.972.833.22.97
2,000,0002.872.753.122.87
2,500,0002.792.693.052.79
3,000,0002.732.6432.73
3,500,0002.682.612.952.68
4,000,0002.642.572.922.64
4,500,0002.62.542.882.6
5,000,0002.572.522.862.57
5,500,0002.542.52.832.54
6,000,0002.522.482.812.52
6,500,0002.492.462.792.49
7,000,0002.472.442.772.47
7,500,0002.452.422.752.45
8,000,0002.432.412.732.43
8,500,0002.412.42.712.41
9,000,0002.42.382.72.4
9,500,0002.382.372.692.38
10,000,0002.372.362.672.37

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 24 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.39
15,0004.964.384.965.14
20,0004.834.264.834.97
25,0004.734.174.734.84
30,0004.654.14.654.74
35,0004.584.044.584.65
40,0004.523.994.524.58
45,0004.473.944.474.51
50,0004.433.914.434.46
55,0004.393.874.394.41
60,0004.353.844.354.36
65,0004.323.814.324.32
70,0004.283.784.294.28
75,0004.253.764.264.25
80,0004.223.734.234.22
85,0004.183.714.214.18
90,0004.163.694.194.16
95,0004.133.674.164.13
100,0004.13.664.144.1
100,0004.13.664.144.1
150,0003.913.523.993.91
200,0003.783.423.883.78
250,0003.683.353.83.68
300,0003.63.293.733.6
350,0003.543.253.683.54
400,0003.483.23.633.48
450,0003.433.173.593.43
500,0003.393.143.563.39
550,0003.353.113.523.35
600,0003.323.083.493.32
650,0003.293.063.473.29
700,0003.263.043.443.26
750,0003.233.023.423.23
800,0003.2133.43.21
850,0003.182.983.383.18
900,0003.162.973.363.16
950,0003.142.953.343.14
1,000,0003.122.943.333.12
1,000,0003.122.943.333.12
1,500,0002.982.833.22.98
2,000,0002.882.753.122.88
2,500,0002.82.693.052.8
3,000,0002.742.6432.74
3,500,0002.692.612.952.69
4,000,0002.652.572.922.65
4,500,0002.612.542.882.61
5,000,0002.582.522.862.58
5,500,0002.552.52.832.55
6,000,0002.532.482.812.53
6,500,0002.52.462.792.5
7,000,0002.482.442.772.48
7,500,0002.462.422.752.46
8,000,0002.442.412.732.44
8,500,0002.422.42.712.42
9,000,0002.412.382.72.41
9,500,0002.392.372.692.39
10,000,0002.382.362.672.38

新築機械設備工事-直接工事費(千円)共通仮設費率(%)-工期( 25 ヶ月)下限(%)上限(%)Kr(%)
10,0005.164.555.165.41
15,0004.964.384.965.16
20,0004.834.264.834.99
25,0004.734.174.734.86
30,0004.654.14.654.75
35,0004.584.044.584.67
40,0004.523.994.524.59
45,0004.473.944.474.53
50,0004.433.914.434.47
55,0004.393.874.394.42
60,0004.353.844.354.38
65,0004.323.814.324.34
70,0004.293.784.294.3
75,0004.263.764.264.26
80,0004.233.734.234.23
85,0004.23.714.214.2
90,0004.173.694.194.17
95,0004.143.674.164.14
100,0004.123.664.144.12
100,0004.123.664.144.12
150,0003.933.523.993.93
200,0003.793.423.883.79
250,0003.73.353.83.7
300,0003.623.293.733.62
350,0003.553.253.683.55
400,0003.53.23.633.5
450,0003.453.173.593.45
500,0003.43.143.563.4
550,0003.373.113.523.37
600,0003.333.083.493.33
650,0003.33.063.473.3
700,0003.273.043.443.27
750,0003.243.023.423.24
800,0003.2233.43.22
850,0003.22.983.383.2
900,0003.172.973.363.17
950,0003.152.953.343.15
1,000,0003.142.943.333.14
1,000,0003.142.943.333.14
1,500,0002.992.833.22.99
2,000,0002.892.753.122.89
2,500,0002.812.693.052.81
3,000,0002.752.6432.75
3,500,0002.72.612.952.7
4,000,0002.662.572.922.66
4,500,0002.622.542.882.62
5,000,0002.592.522.862.59
5,500,0002.562.52.832.56
6,000,0002.542.482.812.54
6,500,0002.512.462.792.51
7,000,0002.492.442.772.49
7,500,0002.472.422.752.47
8,000,0002.452.412.732.45
8,500,0002.432.42.712.43
9,000,0002.422.382.72.42
9,500,0002.42.372.692.4
10,000,0002.392.362.672.39

Powered by DataTables( http://datatables.net/ )
参考資料 - 公共建築工事共通費積算基準(出所:国土交通省) - http://www.mlit.go.jp/common/001033734.pdf